HIS Blueprint

Please wait while flipbook is loading. For more related info, FAQs and issues please refer to DearFlip WordPress Flipbook Plugin Help documentation.

What Has Been Done?

Mar 2021
Conducted a study of facility conditions to identify and prioritize a list of repair and upgrade items

Apr 2021
Developed the scope of work based on the critical priority order

May 2021
Board adopted the scope

Jun 2021
Board adopted HIS Blueprint renovation plan.  Issued a Request for Proposals to multiple architects

Jul 2021
Board interviewed and selected an architect to develop the schematic design

Aug 2021
Board and staff  met and discussed current and future (or desired) facility needs based on ministry usage with the architect

Sep 2021
Board and staff reaffirmed the purpose and objectives for HIS Blueprint at the retreat

Sep – Dec 2021
Collected data on current and future (or desired) usage from Board committees and pastoral staff

Nov 2021
Provided update to the congregation at Year-end Membership Meeting

Jan 2022
Board and staff  met with the architect to review 35% schematic design

Process for HIS blueprint

Dec 2021 – Jun 2022
Schematic Design 

Jul 2022 – Dec 2022
Fundraising

Jan 2023 – Dec 2023
Design development, construction documents, permitting

Jan 2024 – Dec 2025
Construction

How Can I Help?

  • Pray and ask God how He would like you to be involved.
  • Believe that He is able:
    “Now to him who is able to do far more abundantly than all that we ask or think, according to the power at work within us” Ephesians 3:20
  • Learn more about His Blueprint:
    Join the town hall meeting to learn more;
    Join a subcommittee to advance the development

Reach Us